Welding Machine, MIG Series, 3PH/200-440V Global Input Power

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2017-11-22 14:39

  • Browse the number:

    172

Send an inquiries

Company Profile

Guangzhou EACO Electric Equipments Manufacture Co., Ltd.

By certification [File Integrity]

Contact:eacoelectric(Mr.)  

Email:

Telephone: (86 20) 37922343 (86 20) 37922999 Ext:809

Area:Beijing

Address:Conghua Economic Development Zone, Guangzhou, Guangdong, China (510990)

Website: http://eacoelectric.huachuang2011.com/

Product details
Model Number: MAX MIG 505(dual voltage) Brand Name: FONDOF. Key Specifications/Special Features: Brief:Gas metal arc welding (GMAW), sometimes referred to by its subtypes metal inert gas (MIG), welding or metal active gas (MAG) welding, is semi-automatic or automatic arc welding process in which continuous and consumable wire electrode and a shielding gas are fed through welding gunConstant voltage, direct current power source is most commonly used with GMAW, but constant current systems, as well as alternating current, can be usedFour primary methods of metal transfer in GMAW, called globular, short-circuiting, sprayand pulsed-spray, each of which has distinct properties and corresponding advantages and limitations
  • Features:
    • Generator power friendly, mechanical contractors, shipboard installation/repair, out-door field work and mining
    • Multiple functions: MIG/MAG/MMA
    • Amperage/voltage display meter infinite welding amperage/voltage adjustment
    • Crater voltage/voltage for filling crater
    • Adjustable burn back control for dispelling melting balls
    • Protection indicator
    • Spatter control
    • Gas checking 2/4T long time welding control
  • Applications:
    • Metal fabrication
    • Maintenance and repair
    • Auto body/farm
    • Light industrial
    • Construction
    • Production
    • Education, shipbuilding
    • Outdoor field work and mining
  • Shipping Information:
    • FOB Port: Guangzhou
    • Lead Time: 1 - 30 days
    Main Export Markets:
    • Asia
    • Australasia
    • Central/South America
    • Eastern Europe
    • Mid East/Africa
    • North America
    • Western Europe

    Download more information about this product